Center for Design & Manufacturing Excellence (OSU)
Project Overview
The main goal of this project was not to reduce energy consumption, but to increase light levels. Our team created a lighting system using new integrated LED fixtures, offering higher reliability and long term performance. The light level target for post-installation was based on the typical tasks for this work environment. Replacing the existing lighting system, we were able to increase task visibility.